Designing Around Existing Infrastructure Without Creating New Bottlenecks

On paper, it might appear straightforward: the water is pumped into a different location. In reality there are a myriad of factors which can influence the distance between two locations including: elevation of the ground, flow rate, solids, pressure, storage capacity, and access to maintenance.

For Romtec Utilities, the design of an infrastructure for pumping begins with specifying the operational conditions rather than selecting an item from a catalogue. Then, preliminary designs and budgetary requirements can be formulated based on the requirements of the project requires.

Image credit: romtecutilities.com

Think about where are we going?

The engineering is immediately changed.

The flow of wastewater in the domestic system is subject to substantial fluctuations in the course of a day. The wastewater lift station will be required in the event that gravity conveyance fails or is not working. Engineers should consider the following aspects: expected flow and peak conditions, pumping capacity, behavior of the wet well discharge requirements and how equipment is maintained and operated.

Diverse challenges arise from industrial water. The fluids utilized in a processing or manufacturing facility may require caustic or oily, or heated with extreme temperatures or pressure. Romtec Utilities creates industrial systems that are utilized in applications that range from data centers to oil and gas installations Food processing power generation, pharmaceutical waste.

Rainfall could create a completely different operating pattern

Stormwater systems are usually inactive for extended periods and then suddenly face the possibility of a huge volume in a storm.

For instance, a stormwater lift station that is associated with a basin of detention must be compatible with the overall drainage plan for the site. As the water flows into the basin and temporary storage manages the immediate volume, and a pumping system moves the water collected towards an approved discharge point.

Romtec Utilities offered this type of solution to an Norco, California business park. The plan called for an emptying pumping station a detention facility into the public stormwater drainage network. This station had be designed as part of the development’s drainage infrastructure, rather than being treated as a separate piece of equipment.

The term “package” doesn’t have to mean off-the-shelf

A common misconception is that a package pumping system is simply a predetermined collection of components.

In the case of engineered infrastructure, packaging could mean that all major components are coordinated into one system. Pumps, valves and meters and controls, communications structural elements, as well as other equipment may be chosen based on the required duty conditions.

This method is particularly useful for systems that need to be connected to an existing infrastructure. Industrial plants and established municipal facilities are not able to provide unlimited space or completely clean installation conditions. Equipment may need to fit within existing structures, piping electric systems, as well as operating schedules.

Capacity Planning Can Have Real Consequences

If facilities are growing in size, undersizing becomes a significant expense.

At Portland International Airport, Romtec Utilities developed and built an sewer interceptor lift station for the PDX Next expansion. The new station was constructed to double the peak-flow capacity of the existing system as airport facilities expanded.

This illustrates an important element of engineering: specifications for the design should not just reflect what an installation handles in a typical afternoon. Engineers must also understand what happens when demand is at its highest.

The job isn’t finished until the Equipment is delivered

Calculations and drawings will eventually turn into an operating system. The coordination of installations and the documentation are important to long-term success.

A properly designed pumping system will ultimately be defined by what happens in the years following construction. If the flow increases or a storm of major magnitude arrives or equipment needs maintenance the decisions made in preliminary design become very visible.

Romtec Utilities integrates these decisions into a pumping service that is tailored to a particular project. This allows us to transform each piece of equipment into an infrastructure that is designed to handle the environment they be confronted with.